Your lawyers since 1722

Building Details

Building Name945 Front Street, DPR Construction Office Building Size2043.9 sqm
Building Typecommercial Address 945 Front Street San Francisco California 94111 United States Region americas

Performance Details

Net Zero Operational Carbon

Buildings or developments that display best practice outcomes in energy efficiency, are powered by renewable energy, and as such have been verified and certified as "net zero energy and/or carbon" projects.

Achieved Certification Scheme: ILFI Zero Energy
LEED Platinum
Energy Use Intensity (EUI) (kWh/m2/yr): 19.1 Onsite Renewable Production Intensity (RPI) (kWh/m2/yr): 19 Offsite Renewable Energy Procurement Source: Receives electricity from Silicon Valley Clean Energy the electricity is 50% renewable and 50% from non-polluting hydroelectric. Verification Year: 2018-2019

Additional Details

This project serves as the first Zero Net Energy office in San Francisco. The full renovation included upgrading of mechanical systems, and structural upgrades allowed for the installation of a rooftop photovoltaic array with the capacity to provide enough energy over the course of one year to offset any draw of electricity from the grid that the building may have. The building uses lighting strategies including solar tubes, skylights with dynamic glazing, and lighting sensors to improve the quality of access of daylight throughout the entirety of the building.

Submitter's Details

OrganisationIntegral Group Member of GBCUSGBC, CaGBC, GBCA

“This project serves as the first Zero Net Energy office in San Francisco.”