Building/Project Details

Building/Project Name945 Front Street, DPR Construction Office Building/Project Size2043.9 sqm
Building/Project Typecommercial Address 945 Front Street San Francisco California 94111 United States Region americas

Performance Details

Net Zero Operational Carbon

Buildings or developments that are verified and certified as “net zero operational energy and/or carbon.” The building should demonstrate the highest levels of energy efficiency with the use of either renewables generated onsite or renewable energy procured offsite.

Achieved Certification Scheme: ILFI Zero Energy
LEED Platinum
Other Achieved Certification Scheme and Level: LEED v4 Platinum Energy Use Intensity (EUI) (kWh/m2/yr): 19.1 Onsite Renewable Production Intensity (RPI) (kWh/m2/yr): 19 Offsite Renewable Energy Procurement Source: Receives electricity from Silicon Valley Clean Energy the electricity is 50% renewable and 50% from non-polluting hydroelectric. Verification Year: 2018-2019

Tell us your story

This project serves as the first Zero Net Energy office in San Francisco. The full renovation included upgrading of mechanical systems, and structural upgrades allowed for the installation of a rooftop photovoltaic array with the capacity to provide enough energy over the course of one year to offset any draw of electricity from the grid that the building may have. The building uses lighting strategies including solar tubes, skylights with dynamic glazing, and lighting sensors to improve the quality of access of daylight throughout the entirety of the building.

Submitter's Details

OrganisationIntegral Group Member of GBCUSGBC, CaGBC, GBCA

“This project serves as the first Zero Net Energy office in San Francisco.”